General Inspection | 8/2/2016 | 8/2/2016 | 8/2/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 8/2/2016 | 8/2/2016 | 8/2/2016 | P | PASS |
Evan Jenkins
|
|
|
ESC Conditions Satisfied Complete
|
General Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | | PASS |
Evan Jenkins
|
|
|
work near completion. no discharges at this time
|
General Inspection | 4/29/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 1/25/2016 | 1/25/2016 | 1/25/2016 | P | PASS |
Andy J. Long
|
|
|
Antonio Phone #: ###-####
ESC permit sign posted in window of job trailer. Perimeter wattles and private parking lot storm drain inlet bag installed. No MS4 or surface water receives stormwater from site as it is below grade of surrounding pavement.
Approved for construction.
|
Permit Ready to Issue | | | 1/22/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 1/22/2016 | | DONE |
|
|
|
|
Application received | | | 9/25/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 25 2015 1:59PM
|