General Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | | PASS |
Andy J. Long
|
|
|
Work complete, all permits finaled. No disturbed area or loose sediment/materials leaving site. No construction activity or staging.
|
DOC - Permit Finaled | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 11/10/2015 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/10/2015 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/9/2015 | | 10/9/2015 | | PASS |
Andy J. Long
|
|
|
ESC narrative and plan by valid Plan Designer approved. No operator or RP designated, must designate at time of issue.
|
Application received | | | 9/28/2015 | | |
|
|
|
|