Aging Inspection | 8/24/2016 | 8/24/2016 | 8/24/2016 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Evan Jenkins
|
|
|
Project is complete ESC Conditions Satisfied
|
Aging Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/25/2015 | 12/8/2015 | 12/9/2015 | A | PASS |
Evan Jenkins
|
|
|
WIP: foundation poured, silt fence installed. No trackout or any ESC issues observed
|
Site Preparation | 11/24/2015 | 11/25/2015 | 11/25/2015 | A | PASS |
Andy J. Long
|
|
|
Brad Phone #: ###-####
Permit sign posted and a silt fence installed to control access.
Excavation to begin next week. Requested that RP-GC install DI bag and sand bag block to stop water from flowing in the inlet without going through silt sack.
Approved. Will check for bag next inspection scheduled for 12/8.
|
Issue & PRINT permit SFD | | | 11/24/2015 | | DONE |
|
|
|
|
Application received | | | 11/9/2015 | | |
|
|
|
|