Site Final | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Eric Story
|
|
|
site final ok
|
BMP Violation | 3/1/2016 | 3/3/2016 | 3/3/2016 | P | PART |
Andy J. Long
|
|
|
followup
Street and gutter were swept but street is still fairly dirty. Needs futher sweeping and will need to remove the stockpile place in the parking spot.
Does not appear the storm drain at end of the street was cleaned or DI bag changed.
No spills or active discharges. Trash and other materials are contained.
GC needs to continue to work on house keeping.
|
BMP Violation | 2/23/2016 | 3/1/2016 | 3/1/2016 | A | CANC |
Andy J. Long
|
|
|
follow up on dirty culdesac
compliance date extended to Thursday 3/3
|
General Inspection | 2/12/2016 | 2/23/2016 | 2/23/2016 | P | FAIL |
Andy J. Long
|
|
|
Loose dirt, debris, and sawdust leaving site into road and gutter. - porta pot not being serviced
CN posted on window. Clean up loose dirt and debris. Post yellow ESC permit. Do maintenance on DI bag at end of street.
Walker Construction. ###-####
|
General Inspection | 2/10/2016 | 2/11/2016 | 2/12/2016 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Andy J. Long
|
|
|
Brandon Walker ###-####
dupicate inspection
Permit sign posted. Infill site. Stockpiling across street is approved by owner Russ.
Need to install DI bag at end of Arnold. Approved to continue excavation. Excavator taking care to prevent trackout due to active rainfall
|
Site Preparation | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Andy J. Long
|
|
|
Darren Phone #: ###-####
Permit sign posted. Infill site. Stockpiling across street is approved by owner Russ.
Need to install DI bag at end of Arnold. Approved to continue excavation. Excavator taking care to prevent trackout due to active rainfall
|
Permit Ready to Issue | | | 12/3/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 12/3/2015 | | DONE |
|
|
|
|
Application received | | | 11/13/2015 | | |
|
|
|
|