Permit Information
Permit NumberESC15-01520
StatusFinaled
Name CLIVE CULPAN
Site Address 344 N STRATA VIA PL
Project NameLloyd
Customer Number 
ePlanReviewNo
Description
New single family dwelling in foothills. BMPs include inlet protection on Strata Via, construction entrance, washout containment, and wattles installed along the front bank.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/10/20168/11/20168/11/2016PPASS
DetailsAndy J. Long
Home is now complete and landscaped. Sidewalks and gutter have been swept. DI bag at end of culdesac on Strata Via will remain until project next door is complete (same builder). Section of hill behind flat yard has been hydroseeded. ESC conditions satisfied; BLD finaled and hillside bond issued
DOC - Permit Finaled8/11/20168/11/20168/11/2016PPASS
DetailsAndy J. Long
General Inspection8/9/20168/9/20168/10/2016 CANC
DetailsAndy J. Long
General Inspection7/21/20167/21/20167/21/2016 PASS
DetailsEvan Jenkins
minor work continuing of new SFH slowly. No issues observed at this time
General Inspection7/5/20167/5/20167/5/2016 PASS
DetailsEvan Jenkins
no issues observed
General Inspection4/22/20164/22/20164/22/2016PPART
DetailsAndy J. Long
Permit sign posted, down gradient DIs have sediment protection.

Correction request:
- sweep sidewalk in front of both Culpan project
- put some absorbent material on spill stain on roadway and clean up.

Will inspect early next week.
General Inspection4/4/20164/4/20164/4/2016PPASS
DetailsAndy J. Long
WIP on frame. No trackout, workers parking on street. Perimeter wattles and storm drain sediment filter bag are installed.
Site Preparation1/14/20161/14/20161/14/2016PPASS
DetailsAndy J. Long
Approved for excavation earlier in coordination with adjacent lot by same builder.

Snow covered conditions at time of inspection. No trackout, excavator not driving off of lot. Workers parked on street. Perimeter wattles installed. Approved, no corrections at this time.

Issue & PRINT permit SFD  12/18/2015 DONE
Routing - Erosion and Sediment11/27/2015 11/27/2015 DONE
DetailsAndy J. Long
ESC plan and SWPPP narrative submitted and approved. Valid RP and PD for project. Approved.
Application received  11/17/2015 DONE
Application submitted via PDS Online on Nov 17 2015 3:17PM