Permit Information
Permit NumberESC15-01532
StatusFinaled
Name BRENT LOTRIDGE
Site Address 1000 N AMERICANA BLVD
Project NameGardenCity-Americana Greenbelt
Customer Number 
ePlanReviewNo
Description
Construction of section of new Greenbelt path to connect existing paths on south side of Boise River from Ann Morrison Park to Garden City at Main Street bridge. Owner is Boise Parks and Recreation and contractor is Concrete Placement Company. Estimated project duration from November 2015 - September 2016. CGP tracking # IDR12A488. Additional permits filed with ITD, Dept. of Water Resources, and Army Corps of Engineers (CWA 404). Project also inspected by ITD SWPPP inspector and CPC inspector weekly. BMPs include fiber wattles in combination with vegetative buffers, concrete washout containment and proper disposal, trackout controls, storm drain inlet protection. Minimal wetland disturbance (<0.01 acres) listed and dewatering is currently not predicted. Stormwater from Fairview avenue tunnel will be contained in a temporary retention pond at southeast corner of work area. BMPs to be installed incrementally as path extends from Garden City to Ann Morrison.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/5/201710/5/201710/5/2017PPASS
DetailsAndy J. Long
All temporary BMPs (silt fence, wattles, stakes) have now been removed. Path area is stablized and no materials left behind. No further ESC requests. ESC permit finaled.
General Inspection10/3/201710/3/201710/4/2017 PEND
DetailsAndy J. Long
Conference9/13/20179/18/20179/18/2017PPEND
DetailsAndy J. Long
BPR is working on contacting contractor.
General Inspection9/12/20179/12/20179/13/2017 PEND
DetailsAndy J. Long
still working to have silt fence, stakes, and uninstalled wattles between path and river removed. Walk through scheduled.
General Inspection8/28/20178/28/20178/28/2017 PEND
DetailsAndy J. Long
Request to project managers to remove non-temporary BMPs (silt fence at west end of project Main Street bridge/Crab Shack area) as well as wattles no longer installed around site.

Will get determination if Parks staff will do work or contractor for project.
General Inspection8/11/20178/11/20178/14/2017 PEND
DetailsAndy J. Long
General Inspection7/27/20177/27/20177/28/2017 CANC
DetailsAndy J. Long
General Inspection7/12/20177/12/20177/12/2017 PEND
DetailsAndy J. Long
General Inspection6/27/20176/27/20176/27/2017 CANC
DetailsAndy J. Long
General Inspection6/12/20176/12/20176/12/2017 PEND
DetailsAndy J. Long
temp BMP removal/cleanup to be completed when high river levels recede.
General Inspection5/26/20175/26/20175/26/2017 PEND
DetailsAndy J. Long
Repair of submerged areas along new path and removal of damaged BMPs will need to occur this summer. Path complete. No activity at this time.
General Inspection5/11/20175/11/20175/11/2017 CANC
DetailsAndy J. Long
General Inspection4/26/20174/26/20174/26/2017 CANC
DetailsAndy J. Long
General Inspection4/11/20174/11/20174/11/2017 CANC
DetailsAndy J. Long
General Inspection3/27/20173/27/20173/27/2017 CANC
DetailsMelissa Jannusch
General Inspection3/10/20173/10/20173/10/2017 CANC
DetailsAndy J. Long
project complete, wattles along path will need to be removed this Spring. No inpection
General Inspection2/23/20172/23/20172/23/2017 CANC
DetailsMelissa Jannusch
General Inspection2/8/20172/8/20172/8/2017 PEND
DetailsAndy J. Long
Awaiting spring conditions to check re-vegetation and removal of remaining temp BMPs along Greenbelt and river
General Inspection1/24/20171/24/20171/26/2017 CANC
DetailsAndy J. Long
General Inspection1/9/20171/9/20171/9/2017 PEND
DetailsAndy J. Long
General Inspection12/23/201612/23/201612/28/2016 PEND
DetailsAndy J. Long
General Inspection12/8/201612/8/201612/8/2016 PEND
DetailsAndy J. Long
General Inspection11/23/201611/23/201611/23/2016 PEND
DetailsAndy J. Long
General Inspection11/8/201611/8/201611/8/2016 PEND
DetailsAndy J. Long
General Inspection10/24/201610/24/201610/24/2016 PEND
DetailsAndy J. Long
Temp BMP DI bags removed on River Street near Riverside Inn as requested.

MS4 inlets on Fairview still has sediment filter bags installed. Correction to remove already issued to Concrete Placing Co. and Boise Parks n Rec...
General Inspection10/7/201610/7/201610/7/2016 PEND
DetailsAndy J. Long
No changes at site since prior inspection.. waiting for final road improvements. No active construction at this time
General Inspection9/22/20169/22/20169/22/2016 PEND
DetailsAndy J. Long
Project complete, need to remove sediment filter bags from all MS4 drop inlets, Email sent to Parks n Rec and CPC RP
Random Inspection9/7/20169/7/20169/7/2016APEND
DetailsAndy J. Long
Observed temporary BMP sediment filter bags still installed in MS4 inlets. Construction within the drainages of these inlets is complete and stabilized.

VM left to RP Brent with CPC to remove all inlet bags installed (Garden, Fairview, Main). Boise Parks will assume control of the pathway revegetation and BMP removal.
General Inspection8/26/20168/26/20168/26/2016 PASS
DetailsAndy J. Long
revegetation of path shoulders in progress; awaiting temp BMP removal. No violations or BMP failures observed.
Site Final8/11/20168/11/20168/12/2016PPEND
DetailsAndy J. Long
Non-temporary BMPs (silt fence, staging area) have been removed/cleaned up.

The new path is complete and open to public. The shoulders have been hydroseeded and straw wattles remain in areas (biodegradable). Parks & rec will remove stakes during maintenace.

Correction needed:

Need to remove all inlet bags installed on Garden, Fairview, and Main.

Notified RP Brent & Kelly B with Parks.
Site Final8/9/20168/10/20168/11/2016ACANC
DetailsAndy J. Long
Site Final8/9/20168/9/20168/9/2016PCANC
DetailsAndy J. Long
General Inspection8/9/20168/9/20168/9/2016 CANC
DetailsAndy J. Long
rescheduled for site final walk through
General Inspection7/25/20167/25/20167/25/2016 PASS
DetailsAndy J. Long
New pathway section is paved and complete under all bridge under passes. Silt fence and wattles still installed while landscaping is in progress. Crews working on installing railings and site improvements and Fairview bridge. No violations observed. BMPs installed. RP-GC Brent with CPC stated he wants to sign off with Boise P&R on August 5th.

Striping, landscaping, and site clean up & material removal to occur this week and next. Will check back in August to see what corrections may remain.
General Inspection7/7/20167/7/20167/11/2016 PASS
DetailsAndy J. Long
General Inspection6/21/20166/21/20166/23/2016PPASS
DetailsEvan Jenkins
General Inspection5/6/20165/6/20165/6/2016PPASS
DetailsAndy J. Long
WIP on path paving. Silt fence that was overtake by high water has been removed. Inlets around Fairview/Main and sediment filter protection. No trackout. No violations observed.
General Inspection4/11/20164/11/20164/11/2016PPART
DetailsAndy J. Long
WIP on Fairview and Main tunnels. No trackout or discharges from jobsite access points. High river water in tunnel is being pumped in stormwater interceptor system.

Silt fence between path is installed.

No bank damage or water intrusion causing sediment to flow into river.

Correction - need to sweep up former staging area in parking lot south of
General Inspection3/31/20163/31/20163/31/2016PPASS
DetailsAndy J. Long
WIP on path. Bridge & tunnel work on Fairview and Main has clean staging areas with no discharges or trackout. DIs have inlet protect.

Silt fence is still installed between path and river. No corrections issued at this time.
General Inspection3/9/20163/10/20163/16/2016PPART
DetailsAndy J. Long
Need to address trackout on Americana Terrace.
Limited activity currently. Vegetative buffer and sediment controls are installed and have not been disturbed.
General Inspection3/8/20163/8/20163/9/2016PCANC
DetailsAndy J. Long
rescheduled
General Inspection1/20/20161/20/20161/20/2016PPASS
DetailsAndy J. Long
Staging areas for Greenbelt project are free of trackout, turbid discharges or spills. Material management and concrete washout BMPs are implemented.

Silt fence and/or wattle is installed between pathway work area and Boise River in addition to vegetative buffer

Significant amount of transient camp trash along banks has been removed by crews.

No dewatering observed at Main Street bridge or at Ann Morrison. Concrete work in canal channel appears to be complete.

Correction:
- install more rock and/or maintain existing rock entrance at Americana Terrace.
General Inspection12/22/201512/22/201512/23/2015PPASS
DetailsAndy J. Long
Limited activity along length of Greenbelt project. Dewatering system at Ann Morrison is working well with no prohibited discharge.

No trackout or muddy runoff from the staging areas. DIs installed and perimeter wattles along path sections are installed. No corrections at this time.
General Inspection12/4/201512/4/201512/4/2015PPART
DetailsAndy J. Long
Weir tank is on site for dewatering project for well vault under bridge. Water in 3 chamber settling tank is currently clean and not overflowing to river outlet. Workers and RP onsite monitoring tank and outlet.

Observed turbid stream of sheet flow across Crabshack parking and flowing through curb cut into river diversion channel with a very slight plume forming below outlet.

Requested onsite supervisor to install sandbag check dams to divert flow of water till improved stockpile perimeter control is implemented. Sandbag was installed and is now diverting the flow.

Will check back on sheet flow and dewatering later today.

All other inlets in area have filter bag protection. No other violations observed.

Complaint Inspection12/3/201512/3/201512/3/2015PPASS
DetailsAndy J. Long
Flume of turbid discharge into Boise River reported from area of construction at Main Street tunnel.

At time of response, there was no visible plume in the river, though dewatering was still in progress. RP Brent reported that there was a plume but work was stopped until the situation could be rectified. Work is to install a collection well that will remove stormwater and river water from the tunnel in storms or high river levels.

A weir tank has been called into site and will be installed tomorrow AM to add additional treatment. Site stormwater team in process of filing a corrective action report for SWPPP and Notice of Prohibited Discharge for ITD records and CGP reporting.
Site Preparation11/27/201511/30/201511/30/2015APASS
DetailsAndy J. Long
ESC15-014532 Site Preparation Inspection Report
Note: Inspection conducted Wednesday November 25th @10:15 AM
Attendees: Brent Lotridge (CPC), Kelly Burrows (Boise Parks), Jay Biggs (HDR/ITD), Andy Long (ESC Inspector)
Project is to build new section of Greenbelt path from the west end of Ann Morrison Park to the Garden City Greenbelt at Main Street on the south side of the Boise River. Path is approximately 0.6 miles in length and passes under new tunnels being built under Main, Fairview Streets as well as path sections under the Connector, Trestle Bridge and Americana. New storm water infrastructure for ACHD is also occurring at the Fairview Bridge. A pre-fabricated pedestrian bridge is being installed over the Settler’s Canal Diversion channel within the Park. Please see the “permit description” on PDS Online for additional information.
Staging areas are located at Fairview & Main Street bridges, Americana Terrace and some equipment at the canal diversion area. No fuel storage to occur in the staging areas, equipment is fueled by mobile trucks based offsite. Trucks have spill kits and drivers have spill response training.
BMPs inspected and approved:
- Straw wattles properly installed in between pathway construction and river bank in addition to varying widths of undisturbed vegetative buffer areas that are less than 50 feet. ITD Buffer calculation is provided in SWPPP
- Future staging area with stabilized construction entrance located off Americana Terrace with angular rock and geotextile base.
- Existing MS4 storm drains that receive storm water from work areas have been fitted with sediment filter bags.
- Coffer dam structure installed at Diversion Canal work area, no flowing water in area of work and no discharges observed.
- Storm water settling and retention ponds to treat pumped storm water that may collect in tunnel work areas. The system at has 3 chambers with baffle system and settling time and lined conveyance into the Boise River. System operates intermittently as needed. No discharges at time of inspection, turbidity sampling results are being logged in the SWPPP and no measurements exceeding limits have been recorded per site storm water team.
No violations observed at time of inspection. No significant track out, runoff from Main Street Bridge tunnel work area did have some sediment in it but was draining to inlet with a sediment bag. Bag should be check in dry conditions for maintenance
Corrections requested:
- Install additional DI bag on Garden Street in between the entrance to the Crabshack and the Riverside Inn.
- Install sand bag tube check dam(s) in gutter in between Fairview Bridge work area and storm drain with inlet bag to increase sediment control.
- Post yellow permit signs at both ends of project with contact information and Stormwater Hotline #
- Have crews or volunteers should pick up trash in former transient camps in future pathway areas along the Boise River (requested to Boise Parks project manager), especially under the Trestle Bridge.
Site Preparation11/27/201511/27/201511/27/2015PCANC
DetailsAndy J. Long
Issue & PRINT permit COM  11/25/2015 DONE
Application received  11/23/2015  
Routing - Erosion and Sediment11/23/2015 11/23/2015 DONE
DetailsAndy J. Long
SWPPP with narrative site maps submitted and approved. Valid PD and RP designated.
PLANS/APPL TAKEN TO FRONT DESK  11/23/2015 DONE
Permit Ready to Issue  11/23/2015 DONE
all requirements met
Telephone call  11/23/2015 DONE
called Brent told him permit is ready for pick up and fees due