General Inspection | 12/23/2016 | 12/23/2016 | 12/28/2016 | | PASS |
Andy J. Long
|
|
|
Construction complete. Parking lot, landscaping and stormwater facilites installed. No disturbed area, material stockpiles, or temporary BMPs remaining. ESC conditions satisfied.
|
DOC - Permit Finaled | 12/28/2016 | 12/28/2016 | 12/28/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/8/2016 | 12/8/2016 | 12/8/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/23/2016 | 11/23/2016 | 11/23/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No exterior work. NO loose materials or discharges.
|
Site Final | 11/8/2016 | 11/8/2016 | 11/9/2016 | P | NR |
Andy J. Long
|
|
|
BLD permit for shell finaled. Some interior work remaining
|
Tracking Control | 11/8/2016 | 11/8/2016 | 11/8/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/7/2016 | 11/7/2016 | 11/8/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Parking lot and drainage complete. No discharges or trackout.
|
General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Exterior, parking lot paving and landscaping are installed and disturbed area stabilized. Interior work and ongoing equipment and material stagiing is occuring. No violations observed at time of inspection.
|
General Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 | | PASS |
Andy J. Long
|
|
|
Final landscaping and site clean up in progress. Parking lot now paved, sidewalk median landscaped, and DI bag removed on corner. Should be ready for site final with BLD final.
|
General Inspection | 9/6/2016 | 9/6/2016 | 9/6/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/19/2016 | 8/19/2016 | 8/19/2016 | | PASS |
Evan Jenkins
|
|
|
|
BMP Violation | 8/2/2016 | 8/3/2016 | 8/3/2016 | P | PASS |
Andy J. Long
|
|
|
Leaking washout area is now no longer leaking and the puddle and trackout is now swept up.
Initial response is good, need to remove the trash and dried concrete/stucco waste on Thursday and Friday.
No discharges or trackout
|
General Inspection | 8/2/2016 | 8/2/2016 | 8/2/2016 | | FAIL |
Andy J. Long
|
|
|
Uncontained washout leaking and forming puddle at site entrance, and leading to trackout.
Need to clean up washout area immediately and prevent anymore washout there until puddle dries and can be cleaned up.
Verbal CN to begin clean up immediately and prohibit further washout activities in this uncontained puddle area.
Follow up inspection scheduled for tomorrow
|
General Inspection | 7/14/2016 | 7/14/2016 | 7/14/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/28/2016 | 6/28/2016 | 6/28/2016 | P | PASS |
Andy J. Long
|
|
|
Vertical construction under way. ESC permit issued with foundation permit has been finaled. No trackout, storm drain has sediment protection. No fugitive dust or discharges observed. Approved.
|
General Inspection | 4/4/2016 | 4/4/2016 | 4/4/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on frame and apron to 13th street. Clean site with perimeter BMPs, inlet protection and permit sign posted on fence. No trackout or discharges. Gutters clean around both Visser sites on River. See also ESC15-02529 & ESC15-00942
|
Random Inspection | 3/7/2016 | 3/7/2016 | 3/7/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout, construction entrance installed. MS4 on River has inlet bag protection. Clean site, good waste management and housekeeping.
|
Issue & PRINT permit COM | | | 2/18/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 2/16/2016 | | 2/16/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved under ESC15-01529. No duplicate permit necessary for vertical.
|
Application received | | | 12/3/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2015 2:17PM
|