Site Final | 8/10/2016 | 8/10/2016 | 8/10/2016 | A | PASS |
Andy J. Long
|
|
|
All work complete, disturbed areas are now stabilized. No temp BMPs or other materials on site. All permits finaled, ESC conditions satisfied.
|
General Inspection | 7/15/2016 | 7/15/2016 | 7/18/2016 | | PASS |
Andy J. Long
|
|
|
WIP on hangar, near completion. Minimal trackout, parking lot now paved. No spills or discharges observed.
|
Permit Ready to Issue | | | 2/5/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/5/2016 | | DONE |
|
|
|
|
Application received | | | 12/7/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 7 2015 9:47AM
|