Site Final | 4/7/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Eric Story
|
|
|
site final ok
|
General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | A | PASS |
Daryl DeGrange
|
|
|
pass
|
General Inspection | 1/13/2016 | 1/13/2016 | 1/13/2016 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 12/31/2015 | 1/5/2016 | 1/6/2016 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 12/31/2015 | 12/31/2015 | 12/31/2015 | P | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
First set of homes in Belmar Estates are approved for construction. Stormwater system already fitted with sediment protection and is a self contained system.
Designated concrete washout required.
|
Permit Ready to Issue | | | 12/30/2015 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 12/30/2015 | | DONE |
|
|
|
|
Application received | | | 12/14/2015 | | |
|
|
|
|