Site Final | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 7/18/2016 | 7/18/2016 | 7/18/2016 | P | PASS |
Jim Sly
|
|
|
|
Random Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 4/21/2016 | 4/21/2016 | 4/21/2016 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 4/19/2016 | 4/19/2016 | 4/19/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on commercail building. No trackout, material spills, or discharges at site. Perimeter BMPs and inlet protection are installed.
|
Random Inspection | 3/11/2016 | 3/11/2016 | 3/11/2016 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 2/18/2016 | 2/22/2016 | 2/22/2016 | A | PASS |
Andy J. Long
|
|
|
Michael Phone #: ###-####
New building in previously constructed commercial area at Union Square. BMPs include stabilized entrance/staging area, DI filter bags on private and MS4 drains, and RP stated new washout will be installed this week for the foundation work.
Approved.
|
Permit Ready to Issue | | | 2/18/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/18/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/28/2015 | | 12/28/2015 | | PASS |
Andy J. Long
|
|
|
ESC site plan and narrative submitted and approved. Valid RP. Site has active construction already in progress. Site prep/pre-construction conference required, call ###-####
|
Application received | | | 12/22/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 22 2015 11:14AM
|