Aging Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | | PASS |
Andy J. Long
|
|
|
Home complete and occupied. Yard landscaping/stabilization is now acheived. No temp DI bag in MS4 on Coston/Jefferson. ESC condtions satisfied.
|
DOC - Permit Finaled | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/9/2016 | 8/9/2016 | 8/9/2016 | | PASS |
Andy J. Long
|
|
|
Home complete, BLD finaled. Final landscaping and stabilization in progress by home owner.
|
Random Inspection | 6/7/2016 | 6/7/2016 | 6/7/2016 | P | PASS |
Rock A. Hudson
|
|
|
All trash contained. Clean job site.
|
Random Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Near completion. Driveway poured so no trackout, yard below grade so low runoff potential from the yard that is not yet landscaped.
|
Random Inspection | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame and interior. No earthwork. No trackout. Permit posted. Employees parking on street as directed. No corrections.
|
General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. No trackout or discharges. Permit sign posted.
|
Random Inspection | 2/4/2016 | 2/4/2016 | 2/4/2016 | P | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 1/25/2016 | 1/26/2016 | 1/26/2016 | A | PASS |
Andy J. Long
|
|
|
Steve Phone #: ###-####
Permit sign posted. Stabilized entrance for stockpile haul off installed. RP onsite for walk through inspection.
Wood Bros. to install sediment protection on MS4 inlet at Jefferson and Coston this afternoon as well as sweep up after initial excavation activity today
Approved for construction.
|
Permit Ready to Issue | | | 1/25/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 1/25/2016 | | DONE |
|
|
|
|
Application received | | | 12/23/2015 | | |
|
|
|
|