Multi-phase project major remodel/rebuild. This permit will cover entire both phases. Residential addition and retaining walls. Exterior construction activity for first phase includes driveway slab removal. ESC site map and SWPPP narrative submitted. Plan must be kept on site for reference. BMPs include preservation of existing vegetation, straw wattle sediment control and post construction hydroseeding; concrete washout management . BMPs to be installed after interior work and seperate BLD submittal.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/7/20172/7/20172/8/2017 CANC
DetailsAndy J. Long
DOC - Permit Finaled2/8/20172/8/20172/8/2017PPASS
DetailsAndy J. Long
General Inspection1/23/20171/23/20171/23/2017 CANC
DetailsAndy J. Long
General Inspection1/6/20171/6/20171/9/2017 CANC
DetailsAndy J. Long
General Inspection12/22/201612/22/201612/22/2016 CANC
DetailsAndy J. Long
General Inspection12/7/201612/7/201612/8/2016 CANC
DetailsAndy J. Long
General Inspection11/22/201611/22/201611/22/2016 CANC
DetailsAndy J. Long
General Inspection11/7/201611/7/201611/9/2016 CANC
DetailsAndy J. Long
General Inspection10/21/201610/21/201610/24/2016 CANC
DetailsAndy J. Long
General Inspection10/6/201610/6/201610/6/2016 CANC
DetailsAndy J. Long
General Inspection9/21/20169/21/20169/21/2016 CANC
DetailsAndy J. Long
General Inspection9/6/20169/6/20169/6/2016 PEND
DetailsEvan Jenkins
re-veg disturbed areas
General Inspection8/19/20168/19/20168/19/2016 PASS
DetailsEvan Jenkins
General Inspection7/8/20167/12/20167/12/2016APASS
DetailsEvan Jenkins
WIP
Aging Inspection7/8/20167/8/20167/8/2016 CANC
DetailsAndy J. Long
rescheduled 7/12
Routing - Erosion and Sediment12/28/2015 12/28/2015 PASS
DetailsAndy J. Long
ESC site map and SWPPP narrative approved. Designated RP and PD. Approved to start construction up permit issuance.
Issue & PRINT permit SFD  12/28/2015 DONE