Site Final | 6/20/2016 | 6/20/2016 | 6/20/2016 | P | PASS |
Andy J. Long
|
|
|
Requested by RP Jim with Northwest Technologies.
ESC permit conditions satisfied. All disturbed area stabilized, work area cleaned, and temp BMPs (private system sediment filter bags) have been removed. Permt finaled.
|
Site Preparation | 3/18/2016 | 3/21/2016 | 3/21/2016 | A | PASS |
Andy J. Long
|
|
|
James Phone #: ###-####
Two projects at same facility including ADA upgrades and some pipe work on west side of building. Sheet flow drainage for work area is retained onsite. Onsite stormwater DIs have sediment protection. Additional wattles onsite for temporary perimeter stockpile control.
ESC permit signs posted at southwest corner of building. Approved for construction.
|
Permit Ready to Issue | | | 3/7/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 3/7/2016 | | DONE |
|
|
|
|
Application received | | | 1/5/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 5 2016 4:18PM
|