Site Final | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | PASS |
Andy J. Long
|
|
|
Construction of new restaurant complete. Site stormwater facilities and landscaping is installed. Denver street is clean with new drainage swales built with curb cut inlets. Area is hydromulched. No temp. BMPs left onsite.
ESC permit conditions satisfied.
|
General Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame and roof. No trackout to Broadway. Back access to Denver is now walled off, no issues. No corrections at this time.
|
Tracking Control | 1/22/2016 | 1/22/2016 | 1/22/2016 | P | FAIL |
Andy J. Long
|
|
|
No significant trackout to Broadway. Construction entrance is installed on Denver and is inadequate. Trackout occuring to Denver.
Correction: - sweep Denver Street - use correct rock for construction entrance - post yellow ESC sign - block entrance on Broadway to site per ESC plan
|
General Inspection | 1/21/2016 | 1/22/2016 | 1/21/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/20/2016 | 1/21/2016 | 1/21/2016 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 1/20/2016 | 1/20/2016 | 1/20/2016 | P | PASS |
Andy J. Long
|
|
|
Eric w/ Lurre ###-####
Work has started. DI on Broadway has inlet protection. Construction entrance is the existing asphalt of Pinon Square.
|
Issue & PRINT permit COM | | | 1/15/2016 | | DONE |
|
|
|
|
Application received | | | 1/8/2016 | | |
|
|
|
|