Site Final | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PASS |
Phil Shearer
|
|
|
|
Site Final | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | CANC |
Jim Sly
|
|
|
|
Site Preparation | 3/10/2016 | 3/10/2016 | 3/10/2016 | P | PASS |
Andy J. Long
|
|
|
Zack Phone #: ###-####
WIP. Reviewed ESC site prep requirements with Matt with Evans contsruction. No other corrections needed. BMPs for Belmar installed and sites clean.
|
BMP Violation | 2/23/2016 | 2/23/2016 | 2/23/2016 | P | PART |
Andy J. Long
|
|
|
Permit sign posted, no vehicle traciout. Subdivision DIs have inlet protection.
Verbal correction to Matt Sisco with Evans Construction:
1. Sweep sidewalk 2. Provide trash container 3. Pick up loose trash and put in container.
|
Issue & PRINT permit SFD | | | 2/8/2016 | | DONE |
|
|
|
|
Application received | | | 1/27/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 27 2016 3:34PM
|