Site Final | 6/13/2016 | 6/13/2016 | 6/13/2016 | P | PASS |
Andy J. Long
|
|
|
Sweep up in front of home was complete, DI bag changed out. Yard lansdcaped and stabilized. DI bag to stay while house next door is under construction. BLD to be finaled tomorrow.
|
Random Inspection | 6/8/2016 | 6/8/2016 | 6/8/2016 | P | PART |
Andy J. Long
|
|
|
Home near completion. Need to sweep up gutter and sidewalk in front of home. Will have adjacent lot clean up in front of the inlet..
RP Rob stated that subdivision HOA had the irrigation lines fixed and the crew made a mess (which is visible).
Will check back Friday.
|
General Inspection | 3/2/2016 | 3/3/2016 | 3/3/2016 | A | PASS |
Andy J. Long
|
|
|
Permit sign posted. Storm drain has maintained DI bag installed.
|
General Inspection | 2/29/2016 | 2/29/2016 | 3/2/2016 | P | DONE |
Andy J. Long
|
|
|
change RP to Robert McCausslin...
|
Site Preparation | 2/26/2016 | 2/29/2016 | 2/29/2016 | A | PASS |
Andy J. Long
|
|
|
TJ Phone #: ###-####
Subdivision BMPs installed. Flat lot in new development with same builder. Excavation to start tomorrow. Approved.
|
Issue & PRINT permit SFD | | | 2/26/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/26/2016 | | DONE |
|
|
|
|
Application received | | | 2/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 2 2016 1:04PM
|