Site Final | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 4/5/2017 | 4/5/2017 | 4/5/2017 | | PASS |
Melissa Jannusch
|
|
|
Project complete okay to final.
|
General Inspection | 3/21/2017 | 3/21/2017 | 3/21/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 3/6/2017 | 3/6/2017 | 3/7/2017 | | CANC |
Andy J. Long
|
|
|
No activity at site. Wetland area relocation complete, will check for re-establishment next inspection. No issues reported at site.
|
General Inspection | 2/17/2017 | 2/17/2017 | 2/21/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 2/1/2017 | 2/1/2017 | 2/6/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/17/2017 | 1/17/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/2/2017 | 1/2/2017 | 1/4/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/16/2016 | 12/16/2016 | 12/19/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/1/2016 | 12/1/2016 | 12/1/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/16/2016 | 11/16/2016 | 11/16/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/1/2016 | 11/1/2016 | 11/2/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/17/2016 | 10/17/2016 | 10/17/2016 | P | PASS |
Andy J. Long
|
|
|
No recent activity. Relocated wetland has had some vegetation fill in and area being used by ducks & geese. Large stockpile of rock and road mix still on site.
No violations, SWPPP and permit info located next to heavy duty rock construction entrance.
|
General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/28/2016 | 9/28/2016 | 9/28/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2016 | 9/13/2016 | 9/12/2016 | P | PASS |
Andy J. Long
|
|
|
No new activity at site. Wetland vegetation still growing and irrigation water flowing through. SWPPP still posted at entrance. No trackout, fugitive dust, or materials leaving site.
|
General Inspection | 9/1/2016 | 9/1/2016 | 9/1/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Andy J. Long
|
|
|
Inspection or re-located wetland area. Wetlnad vegetation has started to grow within the designated mitigation area. Temporary irrigation water diversion lined channel has been removed. Water is flowing into the area and wate control gates are complete. Construction entrance and SWPPP info located on Victory.
|
General Inspection | 8/4/2016 | 8/4/2016 | 8/5/2016 | A | PASS |
Evan Jenkins
|
|
|
Project is meeting BCC 8-17. No discharges leaving the site at time of inspection
|
Random Inspection | 6/27/2016 | 6/27/2016 | 6/27/2016 | P | PASS |
Andy J. Long
|
|
|
No construction actviity. No fugitive from graded area. Relocated wetland is in process of re-establishing.
No corrections issued at this time. Check for stabilization next inspection.
|
General Inspection | 5/4/2016 | 5/4/2016 | 5/4/2016 | P | PASS |
Andy J. Long
|
|
|
Grading and re-distribution of fill is on-going at site. No fugitive dust observed at time of inspection.
Rock construction entrance and permit sign are located at Victory Rd. No trackout from site.
Irrigation canal lining is installed and is allowing the ditch to travel through site without increasing sediment. Wetland material that was dredged has been stockpile to preserve seed and wetland soils. New wetland mitigation will include this material. Requested that site should check with wetlands specialist to see if stockpile should be kept moist.
No violations at site. Requested some minor maintenance on irrigation ditch lining at south property line.
|
General Inspection | 3/30/2016 | 4/7/2016 | 4/7/2016 | P | PASS |
Andy J. Long
|
|
|
Lining for irrigation ditch diversion channel is installed. The water flowing into the site is already quite turbid, but most like due to the initial flush of the system.
Construction entance preventing trackout, water truck on site for dust suppression.
No corrections requested at this time.
|
Site Preparation | 3/29/2016 | 3/30/2016 | 3/30/2016 | A | PASS |
Andy J. Long
|
|
|
ESC & SWPPP sign posted. Rock construction entrance with geotextile lining is installed for site access off Victory.
Site is approved for 13.25 acres of disturbance, appropriate 404 permit has been approved to relocate the wetland area in the middle of the parcel to the northeast corner for mitigation. Wetland area is fed by Fivemile Creek (currently not flowing) which does convey irrigation water through site. A lined diversion ditch has been installed to diver the water flow around the wetland being filled, and eventually to the new wetland area.
Parcel owner and operator has CGPs filed (IDR12AD49 & IDR12AD62). Syman has prepared SWPPP and will help oversee initial BMP installment.
Soils from the graded area will be used to fill wetland area. The cut & fill is nearly balanced, so there will not be heavy truck traffic in and out of site.
Approved for construction. Will inspect next week to make sure diversion ditch is ready prior to irrigation water service starts for 2016.
|
General Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 | P | CANC |
Andy J. Long
|
|
|
Site prep scheduled for tomorrow 11 AM. Syman Co. on site installing BMPs...no inspection conducted at this time.
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 3/24/2016 | | DONE |
|
|
|
|
Application received | | | 2/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 8 2016 2:42PM
|