General Inspection | 8/24/2016 | 8/24/2016 | 8/24/2016 | | PASS |
Andy J. Long
|
|
|
Wall complete and yard is stabilized. Sidewalk and gutter freee of sediment or construction materials from site. No temp BMP removal remaining. ESC permit condtions met.
|
DOC - Permit Finaled | 8/24/2016 | 8/24/2016 | 8/24/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 4/27/2016 | 4/28/2016 | 4/28/2016 | A | PASS |
Andy J. Long
|
|
|
Jordan Phone #: ###-####
BMPs installed and permit sign posted. RP is onsite supervising. Active earthwork occuring today, requested that sweeping of sidewalk and gutter occur today.
Approved.
|
Permit Ready to Issue | | | 4/27/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/27/2016 | | DONE |
|
|
|
|
Application received | | | 2/12/2016 | | |
|
|
|
|