Site Final | 4/8/2016 | 4/8/2016 | 4/8/2016 | P | PASS |
Andy J. Long
|
|
|
Commercial demolition complete. All materials hauled away and building footprint stabilized with asphalt for surface parking. ESC conditions satisfied. DI had mat installed prior to project start and is not interupt stormwater flow.
|
Site Preparation | 3/8/2016 | 3/8/2016 | 3/8/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. MS4 inlet on Ave B and Myrtle has sediment protection. Approved.
|
Site Preparation | 2/17/2016 | 2/18/2016 | 2/18/2016 | A | DONE |
Dave Hannah
|
|
|
Jill Phone #: ###-#### no one on site no work being done
|
Permit Ready to Issue | | | 2/17/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 2/17/2016 | | DONE |
|
|
|
|
Application received | | | 2/12/2016 | | |
|
|
|
|