Site Final | 7/18/2017 | 7/18/2017 | 7/21/2017 | A | PASS |
Andy J. Long
|
|
|
Work complete, stabilized, and no temporary BMPs remaining. ESC permit conditions satisfied.
|
General Inspection | 7/18/2017 | 7/18/2017 | 7/18/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 7/3/2017 | 7/3/2017 | 7/7/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 6/16/2017 | 6/16/2017 | 6/16/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/1/2017 | 6/1/2017 | 6/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/19/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/16/2017 | 5/16/2017 | 5/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/1/2017 | 5/1/2017 | 5/1/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/14/2017 | 4/14/2017 | 4/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/15/2017 | 3/15/2017 | 3/15/2017 | | PASS |
Andy J. Long
|
|
|
No activity currently. Plaza bricks installed, will resume rest of project once the Centre on Grove expansion project is complete - see ESC15-01613.
|
General Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/13/2017 | 2/13/2017 | 2/13/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 1/27/2017 | 1/27/2017 | 1/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/12/2017 | 1/12/2017 | 1/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/28/2016 | 12/28/2016 | 12/29/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/13/2016 | 12/13/2016 | 12/13/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2016 | 11/28/2016 | 11/28/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/11/2016 | 11/11/2016 | 11/15/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/27/2016 | 10/27/2016 | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
Plaza grading and brick laying between the Grove and Main Street is complete and open to public. DI on Main has inlet bag installed for multiple projects in final stages. No fugitive dust issues, discharges or trackout from construction area. Working in the center of the Grove now for Welcome building and fountain improvements.
|
General Inspection | 9/27/2016 | 9/27/2016 | 9/27/2016 | | PASS |
Andy J. Long
|
|
|
WIP on Grove Plaze resurfacining. Grading is complete, placing bricks and other surface finishes. No stockpiling or materials on surrounding streets. Inlets have filter bag. WIP
|
General Inspection | 9/9/2016 | 9/12/2016 | 9/13/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on Grove plaza remodel. No trackout to surrounding streets, storm drain inlets on 9th and Main have sediment filter protection. No stockpiling or storage in ROW. No fugitive dust issues observed.
|
General Inspection | 9/8/2016 | 9/9/2016 | 9/9/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/8/2016 | 9/8/2016 | 9/8/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 8/24/2016 | 8/24/2016 | 8/25/2016 | | PASS |
Evan Jenkins
|
|
|
|
Complaint Inspection | 6/21/2016 | 6/21/2016 | 6/21/2016 | P | PASS |
Andy J. Long
|
|
|
Two hoses on site for dust control. Issued warning to be proactive, RP Trevor stated that they are.
There are multiple sites and crews in Grove working with variety of potential dust creating activities. RP familiar with fugitive dust rules. Will discuss dust control with Capitol Center RP as well.
|
Issue & PRINT permit COM | | | 5/23/2016 | | DONE |
|
|
|
|
Application received | | | 2/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 16 2016 3:39PM
|