General Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Andy J. Long
|
|
|
Carwash retrofit complete. All disturbed area stabilized. All permits finaled. ESC condtions satisfied.
|
DOC - Permit Finaled | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/18/2016 | 4/18/2016 | 4/18/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. on carwash improvements. Construction materials and loose sediment constained on site. No discharges or spills. Approved.
|
Issue & PRINT permit COM | | | 3/25/2016 | | DONE |
|
|
|
|
Application received | | | 2/29/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/29/2016 | | 2/29/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver submitted and approved for exterior TI. Need to designate an RP upon permit issuance.
|