Site Final | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Andy J. Long
|
|
|
Disturbed area is now stabilized and vegetated. No construction activity occuring. ESC permit finaled.
|
Aging Inspection | 7/31/2017 | 7/31/2017 | 8/1/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 5/29/2017 | 5/29/2017 | 5/30/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 3/27/2017 | 3/27/2017 | 3/27/2017 | | CANC |
Melissa Jannusch
|
|
|
|
Aging Inspection | 1/23/2017 | 1/23/2017 | 1/23/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/20/2016 | 9/20/2016 | 9/21/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/20/2016 | 7/20/2016 | 7/20/2016 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/14/2016 | 6/14/2016 | 6/14/2016 | P | PART |
Andy J. Long
|
|
|
Verbal CN issued to RP Lavon
- change out inlet bag down the street on Mortimer. It is full and no longer filtering water. Some sediment in the road and gutter in front of the project is causing a muddy runoff now by-passing treatment. DI needs to be changed ASAP
VM left - will check back in AM if no call back.
|
Random Inspection | 4/27/2016 | 4/27/2016 | 4/27/2016 | P | PART |
Andy J. Long
|
|
|
note - RP Lavon # ###-#### (listed incorrectly in module)
Site BMPs installed and permit posted, but significant amout of dirt in gutter and evidence of transport downstream
Verbal correction request to perform thorough sweeping/clean up of gutter today to prevent sediment running off with irrigation water or stormwater.
Request also issued Annie with Redco Const. , work covered seperately under ESC15-01437
Lavon stated it would be done. Will check back thursday or friday.
|
Site Preparation | 3/7/2016 | 3/8/2016 | 3/8/2016 | A | PASS |
Andy J. Long
|
|
|
Lavon Phone #: ###-####
RP familiar with ESC permit conditions. Construction of patio and landscaping project to begin today. Main BMPs are preservation of existing vegetation and housekeeping/sweeping oas needed.
|
Permit Ready to Issue | | | 3/2/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 3/2/2016 | | DONE |
|
|
|
|
Application received | | | 2/29/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 2/29/2016 | | 2/29/2016 | | DONE |
Andy J. Long
|
|
|
|