Site Final | 2/28/2017 | 3/7/2017 | 3/6/2017 | A | PASS |
Melissa Jannusch
|
|
|
Okay to final
|
General Inspection | 2/28/2017 | 2/28/2017 | 2/28/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 1/13/2017 | 1/13/2017 | 1/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/28/2016 | 11/28/2016 | 11/28/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/22/2016 | 8/22/2016 | 8/22/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation and support walls. No trackout, fugitive dust, or discharges leaving site. No corrections needed.
|
Site Preparation | 6/7/2016 | 6/7/2016 | 6/7/2016 | A | PASS |
Andy J. Long
|
|
|
Site walk through with RP JC Murray complete. Site is within Riverstone school campus. Building footprint to be excavated below exisng asphalt. Construction access through parking lot of Lysted. Drainage from site will flow to onsite vegetated swale. Yellow permit sign onsite.
Approved for construction.
|
Issue & PRINT permit COM | | | 6/6/2016 | | DONE |
|
|
|
|
Application received | | | 3/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 14 2016 2:52PM
|