Site Final | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Andy J. Long
|
|
|
Construction complete. Street and construction site have been cleaned. SFH now landscaped and occupied. ESC permit conditions satisfied.
|
Aging Inspection | 10/7/2016 | 10/7/2016 | 10/10/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/25/2016 | 7/25/2016 | 7/25/2016 | A | PASS |
Andy J. Long
|
|
|
Permit sign posted, no trackout, spills or other material leaving site. Yard not yet landscaped/stabilized. WIP
|
BMP Violation | 4/20/2016 | 4/26/2016 | 4/26/2016 | P | PASS |
Andy J. Long
|
|
|
CN follow-up
Corrections and clean up completed as requested. RP-GC onsite to review ESC permit conditions and discuss remaing BMPs needed.
Driveway and lot has been cut below road grade and retains stormwater on the flat site. Driveway has sandy base installed to stop mud. Future homeowner lives next door and will monitor trackout and will notifiy Jeff if there are problems.
Site is in compliance.
|
BMP Violation | 4/20/2016 | 4/20/2016 | 4/20/2016 | P | FAIL |
Andy J. Long
|
|
|
Incomplete sweep up after foundation was poured. No concrete washout containment used.
Written CN posted: - sweep up Holden street at both site accesses. - clean up concrete waste - provide stabilzed construction area or leave broom on site for daily sweeping.
|
Permit Ready to Issue | | | 4/6/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 4/6/2016 | | DONE |
|
|
|
|
Application received | | | 3/17/2016 | | |
|
|
|
|