Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Melissa Jannusch
|
|
|
Preformed site walk through with Corey. All earth disturbing activities are complete. Soil is stable. DI bags and temporary BMPs have been removed. The drainage channel to Logger’s creek is complete and stabilized. Drainage pavers appear to be working. Staging area has been cleaned and no equipment has been left behind. No windblown trash around the site. Gave Colby information on filing the NOT for the CGP permit. Ok to final.
|
General Inspection | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Need to sweep staging area and remove equipment before permit can be finaled.
|
Aging Inspection | 2/17/2017 | 2/17/2017 | 2/17/2017 | | PASS |
Melissa Jannusch
|
|
|
See ESC14-00588. Okay
|
Issue & PRINT permit COM | | | 7/11/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/12/2016 | | 5/12/2016 | | DONE |
Andy J. Long
|
|
|
No new ESC permit needed. Covered under existing permit ESC14-00588
|
Application received | | | 4/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 14 2016 2:32PM
|