Site Final | 3/6/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Andy J. Long
|
|
|
Final landscaping near complete. BLD has temp. occupancy and is over 70% stabilized. Site stormwater management is complete and no offisite runoff. ESC permit conditions satisified.
|
General Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 1/18/2017 | 1/18/2017 | 1/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/22/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout or discharges. Onsite stormwater management now installed. No corrections requested.
|
General Inspection | 11/22/2016 | 11/22/2016 | 11/22/2016 | | CANC |
Andy J. Long
|
|
|
|
Random Inspection | 10/7/2016 | 10/7/2016 | 10/7/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on storage complex. Perimeter structures are now erected. Other buildings in progress. No trackout to Eagle, rock construction entrance installed, yellow permit sign posted at entrance. No corrections requested at this time.
|
(F) Reprint permit | | | 9/23/2016 | | DONE |
|
|
|
|
General Inspection | 8/12/2016 | 8/12/2016 | 8/12/2016 | A | FAIL |
Evan Jenkins
|
|
|
No construction Entrance. Tackout occuring onto Eagle Road. Left RP JC a VM stating to get construction entrance installed. No Dust control taking place. Powder dust causing issues with neighbors
|
Site Preparation | 7/11/2016 | 7/11/2016 | 7/11/2016 | P | PASS |
Andy J. Long
|
|
|
Onsite contact - Milt ###-####
BMPs installed include: - permit posted - silt fence perimeter control to protect neighboring property and keep in sediment - rock construction entrance to limit trackout - water truck on site for dust control.
Closed out initial demo & grading permit ESC16-00734
|
Permit Ready to Issue | | | 6/29/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/29/2016 | | DONE |
|
|
|
|
Application received | | | 4/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 15 2016 2:12PM
|