General Inspection | 10/26/2016 | 10/26/2016 | 10/26/2016 | | PASS |
Andy J. Long
|
|
|
Modular building installed within Fedex shipping facility. BLD finaled, ESC conditions satisfied.
|
DOC - Permit Finaled | 10/26/2016 | 10/26/2016 | 10/26/2016 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 5/31/2016 | 5/31/2016 | 5/31/2016 | P | CANC |
Andy J. Long
|
|
|
Randy Phone #: ###-####
Data Entry Error. Site Prep Inspection already performed by Andy
|
Issue & PRINT permit COM | | | 5/31/2016 | | DONE |
|
|
|
|
Site Preparation | 5/24/2016 | 5/26/2016 | 5/26/2016 | A | PASS |
Andy J. Long
|
|
|
Randy @ 8:45-9 AM ####-####
Project to start next week. Still in process of picking up GRD permit. Will need to protect an existing swale on site with wattle to prevent any damage to the infiltration rates. Low risk project in industrial yard. Onsite stormwater retention. Approved for construction when all permits acquired.
|
Routing - Erosion and Sediment | 5/12/2016 | | 5/12/2016 | | DONE |
Andy J. Long
|
|
|
ESC site map and narrative submitted and approved. Valid Plan Designer; RP to be designated
|
Application received | | | 4/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Apr 20 2016 2:33PM
|