Aging Inspection | 11/10/2016 | 11/10/2016 | 11/10/2016 | | PASS |
Andy J. Long
|
|
|
Backyard pool project complete and disturbed area stabilized.
|
DOC - Permit Finaled | 11/10/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 | P | PASS |
Andy J. Long
|
|
|
Concrete washout material and residue left in gutter in front and down grade from home has been thoroughly swept and clean.
Onsite Titan Pools supervisor stated that clean up was conducted Friday and that event was lesson to contain washout better and use dams in gutter to prevent flow of washout material beyond site.
|
BMP Violation | 5/25/2016 | 5/25/2016 | 5/26/2016 | P | PART |
Andy J. Long
|
|
|
Need to continue sweep up of cement residue in gutter. Use dust pan and collect in 10 gallon bucket.
Dirty site next to this project also issued corrections.
|
Site Preparation | 5/20/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 5/18/2016 | 5/19/2016 | 5/19/2016 | A | PASS |
Andy J. Long
|
|
|
James Phone #: ###-####
Pool installation in landscaped backyard. Flat area, low risk. RP familiar with ESC permit conditions & rules
|
Issue & PRINT permit SFD | | | 4/27/2016 | | DONE |
|
|
|
|
Application received | | | 4/22/2016 | | |
|
|
|
|