Site Final | 4/17/2017 | 4/17/2017 | 4/18/2017 | P | PASS |
Melissa Jannusch
|
|
|
Pool is complete. Soil around pool is stable. Some trash remaining ensure this is picked up with the building esc permit final. Okay to close pool permit.
|
General Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/15/2017 | 3/15/2017 | 3/15/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed. Trackout and trash contained.
|
General Inspection | 2/10/2017 | 2/10/2017 | 2/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/9/2017 | 1/9/2017 | 1/12/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/8/2016 | 12/8/2016 | 12/8/2016 | | PASS |
Andy J. Long
|
|
|
WIP on hotel and pool area. Installing silva cell storm water system under sidewalks. No trackout from site, no discharges.
No corrections requested.
Streets will need a good sweeping.
|
Issue & PRINT permit SFD | | | 11/14/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/27/2016 | | 5/27/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. See also ESC15-01483. No site prep inspection required. Will need concrete washout containment.
|
Application received | | | 5/24/2016 | | DONE |
|
|
|
Application submitted via PDS Online on May 24 2016 10:30AM
|