Site Final | 4/11/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Melissa Jannusch
|
|
|
Preformed site walk through with Corey. All earth disturbing activities are complete. Soil is stable. DI bags and temporary BMPs have been removed. The drainage channel to Logger’s creek is complete and stabilized. Drainage pavers appear to be working. Staging area has been cleaned and no equipment has been left behind. No windblown trash around the site. Gave Colby information on filing the NOT for the CGP permit. Ok to final.
|
General Inspection | 4/10/2017 | 4/10/2017 | 4/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. Need to sweep staging area and remove equipment before permit can be finaled.
|
Aging Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC violations observed.
|
Aging Inspection | 1/5/2017 | 1/5/2017 | 1/10/2017 | | CANC |
Andy J. Long
|
|
|
|
Telephone call | | | 6/15/2016 | | DONE |
|
|
|
talked to Greg threw email about his RP # being expired. He will sign up for the class and email me the receipt
|
Permit Ready to Issue | | | 6/15/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/15/2016 | | DONE |
|
|
|
|
Application received | | | 6/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2016 9:16AM
|