Site Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Andy J. Long
|
|
|
Work complete, disturbed area stabilized. No temporary BMPs remaining. All permits finaled, building occupied.
|
Aging Inspection | 9/5/2017 | 9/5/2017 | 9/8/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 7/5/2017 | 7/5/2017 | 7/5/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/12/2016 | 10/20/2016 | 10/21/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted on chain link fence. Entrance to work area is paved. No trackout to Targee, disturbance within self contained industrial yard, wattles on site for stockpile control. No corrections requested
|
Site Preparation | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Approved via phone conference. Project confined with industrial staging yard that is recycled asphalt. Concrete apron to road will be swept regularly to control trackout as necessary. Follow up inspection scheduled for next week to check on progress/conditions.
|
Permit Ready to Issue | | | 10/11/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/11/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/11/2016 | | DONE |
|
|
|
|
Application received | | | 6/3/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 3 2016 12:34PM
|