General Inspection | 5/16/2017 | 5/16/2017 | 5/16/2017 | | PASS |
Melissa Jannusch
|
|
|
Soil is stable. No temporary BMPs remaining. Ok to final.
|
Site Final | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 3/31/2017 | 3/31/2017 | 3/31/2017 | | PASS |
Melissa Jannusch
|
|
|
No WIP. Lot has been graded flat. Sign is posted no trackout. No corrections requested
|
General Inspection | 2/13/2017 | 2/13/2017 | 2/14/2017 | | PASS |
Melissa Jannusch
|
|
|
No trackout. Sign posted. No ESC corrections.
|
General Inspection | 12/23/2016 | 12/23/2016 | 12/28/2016 | | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 7/19/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 7/19/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/15/2016 | | 6/15/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan and site BMP map approved. Valid Plan Designer, need to designated valid RP from K2 Construction. Site preparation inspection required.
|
Application received | | | 6/7/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2016 2:07PM
|