Site Final | 7/24/2017 | 7/27/2017 | 7/26/2017 | A | PASS |
Andy J. Long
|
|
|
Concrete and dried stucco waste around perimeter has been clean. Parking lot has been swept. DI bags on Barber Valley to remain installed and maintained under Brighton's permit.
No ESC corrections, permit finaled.
|
Site Final | 7/24/2017 | 7/24/2017 | 7/24/2017 | A | NR |
Andy J. Long
|
|
|
Need to have crews clean up stucco and concrete waste around site perimeter. Pick up loose trash before dumpster is removed.
Median between sidewalk and curb to be landscaped in the future, graded below edge of pavement.
OK to final BLD w/o ESC final.
|
General Inspection | 7/17/2017 | 7/17/2017 | 7/17/2017 | | PASS |
Melissa Jannusch
|
|
|
Interior and exterior WIP. Trash contained. No trackout. No corrections issued.
|
General Inspection | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Andy J. Long
|
|
|
Framing in progress. No trackout, trash is contained. Concrete washout bin was utilized. No violations observed.
|
General Inspection | 5/8/2017 | 5/8/2017 | 5/10/2017 | | PASS |
Melissa Jannusch
|
|
|
Vertical WIP. No trackout, trash is contained, sign is posted. No corrections requested.
|
Site Preparation | 3/21/2017 | 3/22/2017 | 3/22/2017 | A | PASS |
Melissa Jannusch
|
|
|
Flat site. Spoke with RP will install construction entrance and hang sign before work begins. Okay to start.
|
Issue & PRINT permit COM | | | 3/21/2017 | | DONE |
|
|
|
|
Application received | | | 6/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 20 2016 8:43AM
|