Site Final | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/29/2017 | 12/29/2017 | 12/29/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/13/2017 | 11/13/2017 | 11/13/2017 | | PASS |
Andy J. Long
|
|
|
No issues. Not ready for final
|
General Inspection | 9/26/2017 | 9/26/2017 | 9/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/11/2017 | 8/11/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/26/2017 | 6/26/2017 | 6/27/2017 | | PASS |
Andy J. Long
|
|
|
Site parking area and curbing are now installed with connections to the unfinished storm water swales. Landscaping in progress. No trackout, fugitive dust or other issues. No corrections requested.
|
General Inspection | 5/10/2017 | 5/10/2017 | 5/10/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. No sediment leaving site. Perimeter controls are intact. No corrections requested.
|
General Inspection | 3/24/2017 | 3/24/2017 | 3/24/2017 | P | PASS |
Andy J. Long
|
|
|
Parking lot now paved. WIP on apron entrances and perimeter landscaping. No violations observed..
|
General Inspection | 3/14/2017 | 3/14/2017 | 3/14/2017 | P | PASS |
Melissa Jannusch
|
|
|
Grading appears to be complete and ready for roads. No trackout. No ESC corrections.
|
General Inspection | 2/24/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Andy J. Long
|
|
|
No trackout or discharges from site entrances. DI protection installed. Will need to repair some damaged perimeter wattles in areas where the sidewalk edge is below grade of the project. No fugitve dust. Minimal activity at time of inspection. No corretions requested.
|
General Inspection | 2/2/2017 | 2/2/2017 | 2/6/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/9/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Andy J. Long
|
|
|
WIP. Perimeter watttles installed around site properly. No trackout to Cloverdale or Executive. MS4 inlets protected. No corrections needed.
|
General Inspection | 11/3/2016 | 11/9/2016 | 11/9/2016 | P | PASS |
Andy J. Long
|
|
|
Perimter wattles properly installed around active construction site. Onsite storm water drainage has sediment protecton BMPs installed. Stabilized entrances to area have been preserved. No significant trackout to Executive. No fugitive dust at time of inspection.
Approved. No corrections requested.
|
Site Preparation | 10/31/2016 | 11/2/2016 | 11/3/2016 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | CANC |
Andy J. Long
|
|
|
Jeff Phone #: ###-####
phone conference conductted. Site prep scheduled for Wed 11/2 PM
|
Conference | 10/31/2016 | 10/31/2016 | 10/31/2016 | A | PASS |
Andy J. Long
|
|
|
phone conference with RP Jeff. ###-#### ACHD staging yard work approved to begin removing stock piles tomorrow AM. Site preparation walk through to be conducted on Wednesday.
RP familiar with ESC conditions. Permit sign to be posted with SWPPP info.
|
Permit Ready to Issue | | | 10/31/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/31/2016 | | DONE |
|
|
|
|
Application received | | | 6/27/2016 | | |
|
|
|
|