Site Final | 7/7/2017 | 7/10/2017 | 7/11/2017 | P | PASS |
Andy J. Long
|
|
|
Work complete. Building occupied, landscaped and site stormwater drainage installed. No temporary BMPs remaining on site.
|
General Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 5/22/2017 | 5/22/2017 | 5/22/2017 | | PASS |
Andy J. Long
|
|
|
WIP on site improvements and perimeter curbing. BMPs installed. NO trackout or fugitive dust occuring. Building frame complete. No corrections requested
|
General Inspection | 4/6/2017 | 4/6/2017 | 4/6/2017 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Perimeter watttles and preserved vegetation strip around border. Frame is up,not yet paved with site improvements. No corrections.
|
General Inspection | 2/15/2017 | 2/15/2017 | 2/21/2017 | | CANC |
Melissa Jannusch
|
|
|
|
Permit Ready to Issue | | | 10/11/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/11/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/19/2016 | | 7/19/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan approved. Valid PD designated, contractor with RP to be determined at contract award. ESC site preparation inspection is required prior to any grading activity.
|
Application received | | | 7/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 8 2016 8:28AM
|