General Inspection | 8/11/2017 | 8/11/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 7/27/2017 | 7/27/2017 | 7/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/12/2017 | 7/12/2017 | 7/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. No corrections.
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP on landscpaing and exterior.
|
General Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/11/2017 | 5/11/2017 | 5/11/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 4/26/2017 | 4/26/2017 | 4/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. Soil is contained on site. There is still exposed soil.
|
General Inspection | 3/22/2017 | 3/22/2017 | 3/22/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. BMPs in place and maintained. No ESC issues observed.
|
General Inspection | 3/7/2017 | 3/7/2017 | 3/7/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. Terraced landscaping almost complete. Wattles located along downhill perimeter. No trackout. Using existing driveway as a construction entrance.
|
Issue & PRINT permit COM | | | 8/8/2016 | | DONE |
|
|
|
|
Application received | | | 7/12/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/12/2016 | | 7/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid PD designated, RP Noah Richter becoming certified 7/13/2016. Site prep required, call ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2016 | | DONE |
|
|
|
|