Site Final | 3/12/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Andy J. Long
|
|
|
Construction complete. Temporary sediment bags on Targee installed from project have been removed. Completed permanent stormwater facilities retain stromwater on site, ESC permit conditions satisfied.
|
Site Final | 2/20/2018 | 2/21/2018 | 2/22/2018 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/19/2018 | 2/19/2018 | 2/20/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | NR |
Andy J. Long
|
|
|
some work still remains, no violations at site. No construction activity.
|
General Inspection | 9/22/2017 | 9/22/2017 | 9/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/7/2017 | 8/7/2017 | 8/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/21/2017 | 6/21/2017 | 6/21/2017 | | PASS |
Andy J. Long
|
|
|
No construction activity. Some areas of the RV sale lot are in use. Permanent onsite stormwater facilities installed. PWK and GRD permits are open and SWPPP and COB ESC permit posted. Will continue to monitor. No ESC violations observed.
|
General Inspection | 5/2/2017 | 5/2/2017 | 5/2/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Final | 3/13/2017 | 3/14/2017 | 3/13/2017 | A | NR |
Andy J. Long
|
|
|
No violations at site. Perimeter landscaping on the north border not yet established. Parking lot paved and stormwater retention installed. Some stockpiles remain on site and minor activity. Will monitor through Spring
|
General Inspection | 3/8/2017 | 3/10/2017 | 3/13/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for 3/10
|
General Inspection | 12/7/2016 | 12/14/2016 | 12/14/2016 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/21/2016 | 12/6/2016 | 12/7/2016 | A | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on new parking area. No trackout or discharges occuring. New onsite drainage has sediment protection. No corrections requested.
|
Site Preparation | 10/21/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Andy J. Long
|
|
|
Jesse CA #: ###-####
Onsite meeting with RP Jaron and K2 super-indentant Ty.
Industrial/commercial site with onsite retention. Project duration is < 2 months. DI bag installed to the west of existing stabilized entrance on Targee. Silt fence installed on north boundary to protect drainage/irrigation ditch parallet to I-84. Requested that water truck be available for fugitive dust control as needed. Currently okay w/o. Site has SWPPP for CGP.
Approved for construction. Grading now in progress.
|
Override - Parcel Holds | 10/21/2016 | 1/1/1900 | 10/21/2016 | | |
|
|
|
esc
|
Override - Parcel Holds | | | 10/21/2016 | | |
|
|
|
|
Override - Parcel Holds | | | 10/21/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 10/21/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/21/2016 | | DONE |
|
|
|
|
Application received | | | 7/29/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map are approved. Valid PD, RP to be designated.
|
Application received | | | 7/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 15 2016 3:02PM
|