Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC16-01009
StatusFinaled
Name JIM STEWART
Site Address 7333 W USTICK RD
Project Name15124-Maverik Boise 198
Customer Number 
ePlanReviewNo
Description
New building and fuel canopy
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/3/20177/3/20177/3/2017APASS
DetailsAndy J. Long
Maverik store complete, landscaped and stabilized. Staging lot to the east of site has had an application of mulch. Stormwater swale installed, DI sediment bag installed on Ustick has been removed. ESC permit conditions satisfied.
General Inspection5/19/20175/19/20175/19/2017 CANC
DetailsAndy J. Long
General Inspection3/30/20174/3/20174/3/2017APASS
DetailsAndy J. Long
Employees now parking in staging lane to stay off mud/dirt, new rock installed at entrance. No new trackout. Silt fence perimeter installed. MS4 on Ustick has filter bag protection. Apprroved.
General Inspection3/24/20173/28/20173/30/2017APART
DetailsAndy J. Long
No significant trackout but still no improved construction entrance provided since first notice 3/9.

RP to install new drain rock and prohibit all non-essential traffic into site until new approach and asphalt to be installed mid April.

Re-inspection schedule, if Fail, will assess inspection fee.
Tracking Control3/23/20173/23/20173/24/2017PPEND
DetailsAndy J. Long
Track out from yesterday has been cleaned.

Corrections remaining:
- install new construction entrance or alternative BMP (rumble bars)
- check inlet bag for maintenance
General Inspection3/23/20173/23/20173/23/2017AFAIL
DetailsAndy J. Long
No improved construction entrance provided. Accumulated dirt and trackout in bike lane on south side of Ustick east of project entrace.

Request for sweeping and re-inspect construction entrance.
General Inspection3/9/20173/16/20173/23/2017PCANC
DetailsAndy J. Long
Tracking Control3/8/20173/8/20173/9/2017PPART
DetailsAndy J. Long
Trackout reported from yesterday was swept. Inlet down gradient from entrance area has sediment filter bag properly installed.

Verbal correction request to RP:
- repost new ESC permit sign on SWPPP board
- improve construction entrance trackout controls:
i.e. lengthen entrance distance, turn over existing rock, add angular rock chunks, wheel brooming and regular cleaning of sidewalk apron

Will check on entrance improvements next week.
Site Preparation3/3/20173/3/20173/6/2017PCANC
DetailsAndy J. Long
Issue & PRINT permit COM  1/17/2017 DONE
Application received  7/22/2016 DONE
Application submitted via PDS Online on Jul 22 2016 3:48PM