Site Final | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 6/8/2017 | 6/8/2017 | 6/8/2017 | | PASS |
Melissa Jannusch
|
|
|
Building complete. Landscaping complete. No temp BMPs remaining okay to final.
|
Site Final | 4/7/2017 | 4/28/2017 | 4/28/2017 | P | PEND |
Andy J. Long
|
|
|
|
General Inspection | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PASS |
Andy J. Long
|
|
|
Duplex project near completion. Landscaping completed and open areas have recently been hydroseeded. No violations observed, will monitor growth of grass
|
Random Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Vegetative strip around project area has remained intact. No trackout, sediment runoff or spills observed. Permit sign posted in alley where staging is occuring. Approved.
|
General Inspection | 9/19/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation. Outpak washout on site for concrete work. No trackout or loose dirt on sidewalk. Vegetative buffer around edges still in place. Approved.
|
Complaint Inspection | 9/19/2016 | 9/19/2016 | 9/19/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on tree removal simultaneously with foundation excavation and installation.
Permit sign posted in alley. Stockpiles stored within grass perimeter buffer and will be backfilled. No trackout or loose dirt observed on sidewalk or gutter of 29th or Gooding. Will check back later this week to make sure backfill has been cleaned up. No loose trash or overfilled bins found.
|
Issue & PRINT permit SFD | | | 9/9/2016 | | DONE |
|
|
|
|
Application received | | | 8/4/2016 | | |
|
|
|
|