General Inspection | 4/16/2018 | 4/16/2018 | 4/16/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 3/1/2018 | 3/1/2018 | 3/2/2018 | P | NR |
Andy J. Long
|
|
|
Need to remove temporary storm drain filter bags installed on Jennie Lane
|
General Inspection | 2/23/2018 | 2/23/2018 | 2/23/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2018 | 1/8/2018 | 1/9/2018 | | PASS |
Michael Zawacki
|
|
|
Parking lot and landscaping complete. Some storage in parking lot. Most disturbances completed, no issues.
|
General Inspection | 11/21/2017 | 11/21/2017 | 11/21/2017 | | PASS |
Michael Zawacki
|
|
|
Building exterior almost complete. Parking lot is paved and completed. No trackout or runoff. Trash in cleaned up. Some paving on Jennie St but it is for ACHD and not building.
|
General Inspection | 10/6/2017 | 10/6/2017 | 10/10/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/21/2017 | 8/21/2017 | 8/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/4/2017 | 7/4/2017 | 7/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on site perimeter improvements and foundation. Project is located behind the Stinker Station. Permit sign is posted. Approved.
|
General Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Melissa Jannusch
|
|
|
No WIP at time of inspection. Sign is posted. Dumpster on site for trash. Stormwater infrastructure is in the stages of being installed. The road edge and sidewalk have been excavated. No trackout. Some trash onsite. Project ok.
|
General Inspection | 4/12/2017 | 4/12/2017 | 4/14/2017 | | CANC |
Andy J. Long
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/10/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/7/2016 | | 9/7/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map submitted and approved. Valid PD designated, RP to be designated upon contract reward.
|
Application received | | | 8/11/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2016 7:39PM
|