Aging Inspection | 5/19/2017 | 5/19/2017 | 5/19/2017 | | PASS |
Andy J. Long
|
|
|
All permits finaled. ESC conditions satisfied. No corrections.
|
DOC - Permit Finaled | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 9/14/2016 | 9/19/2016 | 9/19/2016 | A | PART |
Andy J. Long
|
|
|
Grant Phone #: ###-####
Approved for construction, washout installed for foundation pouring. Trash and materials from active sites are contained.
Correction request to sweep west side gutter on 23rd Lane to remove some loose sediment accumulations. Permit sign posted, same builder as active house.
|
Issue & PRINT permit SFD | | | 9/9/2016 | | DONE |
|
|
|
|
Application received | | | 8/25/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 25 2016 1:11PM
|