Site Final | 5/26/2017 | 6/9/2017 | 6/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
Soil is stable. okay to final.
|
General Inspection | 5/25/2017 | 5/25/2017 | 5/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed.
|
Site Preparation | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Sediment control wattle installed to prevent loose dirt from running downhiill. Approved for construction
|
Issue & PRINT permit COM | | | 9/20/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2016 | | DONE |
|
|
|
all requirements met
|
Telephone call | | | 9/16/2016 | | DONE |
|
|
|
called Lavon- left message that permit is ready and NO fees are due
|
Application received | | | 9/14/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 9/14/2016 | | 9/14/2016 | | PASS |
Andy J. Long
|
|
|
Removal of tree roots, small concrete pad poured over disturbed area and other landscaping.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2016 | | |
|
|
|
|