Site Final | 9/13/2017 | 9/15/2017 | 9/19/2017 | P | PASS |
Andy J. Long
|
|
|
finaled by BLD inspector
|
Site Final | 9/18/2017 | 9/18/2017 | 9/18/2017 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 9/18/2017 | 9/18/2017 | 9/18/2017 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/13/2017 | 9/13/2017 | 9/13/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/29/2017 | 8/29/2017 | 8/29/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/14/2017 | 8/14/2017 | 8/16/2017 | | DEFR |
Andy J. Long
|
|
|
can be finaled with BLD permit
|
General Inspection | 7/27/2017 | 7/27/2017 | 7/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/28/2017 | 7/12/2017 | 7/13/2017 | A | PASS |
Melissa Jannusch
|
|
|
Nearly complete. Landscaping not installed yet. Landscaping needs to be compelte before ESC is finaled. Need to sweep curb and gutter line and remove temp BMPs before final.
|
General Inspection | 6/28/2017 | 6/28/2017 | 6/28/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/9/2017 | 6/9/2017 | 6/13/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 12/7/2016 | 12/8/2016 | 12/8/2016 | A | PASS |
Andy J. Long
|
|
|
Troy Phone #: ###-####
Perimeter wattles installed, lined concrete washout pit excavatied and in good position for access by concrete truck.
Permit sign to be posted when excavation starts. Next inspection check for need for wattles on northeast corner of lot to protect neighbor's back yard.
Approved to start.
|
Permit Ready to Issue | | | 12/2/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 12/2/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/28/2016 | | 10/28/2016 | | DONE |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid PD and RP designated. Site preparation inspection required, call ###-#### or ###-####
|
Application received | | | 9/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 21 2016 3:43PM
|