Site Final | 7/10/2017 | 7/10/2017 | 7/10/2017 | A | PASS |
Andy J. Long
|
|
|
Site is stabilized, BLD permit finaled. Temporary DI sediment bags installed on MS4 inlets on Cable Car have been removed as requested.
ESC permit conditions satisfied.
|
Site Final | 6/21/2017 | 6/21/2017 | 6/21/2017 | A | NR |
Andy J. Long
|
|
|
Work complete and stabilized.
Correction request to get ESC site final: - remove all temporary DI bags on Cable Car
|
Permit Ready to Issue | | | 10/14/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 10/14/2016 | | DONE |
|
|
|
|
Application received | | | 9/29/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 9/29/2016 | | 9/29/2016 | | DONE |
Andy J. Long
|
|
|
ESC plan waiver approved. Valid RP designated.
|