Site Final | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PASS |
Melissa Jannusch
|
|
|
Trackout has been cleaned. Landscaping complete okay to final.
|
Tracking Control | 5/5/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Brandon Shaw
|
|
|
|
Tracking Control | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Some trackout has been cleaned but more sweeping is still needed. Will check back Monday.
|
Tracking Control | 5/5/2017 | 5/5/2017 | 5/5/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Large amount of trackout from landscaping that need immediate attention. The amount of trackout is unacceptable. Luke is no longer the current RP. Left a message with John Seidl requesting immediate action on cleaning trackout today. Will return this afternoon for compliance inspection.
|
General Inspection | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. Street,sidewalk and gutter cleaned. Foundation recently poured, concrete washout containment utilized. RP-GC onsite. No violations.
|
Site Preparation | 11/4/2016 | 11/4/2016 | 11/4/2016 | P | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
Subdivision BMPs installed. Permit sign posted. RP-GC on site for supervision. First SFH of DHE #15
|
Permit Ready to Issue | | | 11/4/2016 | | DONE |
|
|
|
|
Issue & PRINT permit SFD | | | 11/4/2016 | | DONE |
|
|
|
|
Application received | | | 10/12/2016 | | |
|
|
|
|