Site Final | 7/7/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Andy J. Long
|
|
|
Project complete, stabilized/re-vegetated. ESC conditions satisfied.
|
DOC - Permit Finaled | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Andy J. Long
|
|
|
Project near completion. Access road from below work has started to revegetate. No corrections.
|
Site Preparation | 11/2/2016 | 11/4/2016 | 11/4/2016 | A | PASS |
Andy J. Long
|
|
|
Cary Phone #: ###-####
ESC permit sign posted and wattles staged for installation once the access through yard is created. RP familiar with ESC conditions. Approved.
|
Issue & PRINT permit SFD | | | 11/2/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 10/27/2016 | | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan and narrative submitted and approved. Valid PD and RP designated. Call ###-#### or ###-#### for ESC site preparation inspection.
|
Application received | | | 10/19/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/19/2016 | | 10/19/2016 | | FAIL |
Andy J. Long
|
|
|
ESC plan or ESC plan waiver required due to hillside construction
|