General Inspection | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Andy J. Long
|
|
|
Note: remaining inspections shall be entered under ESC17-00190, which is connected to the hillside zone GRD permit for Hackberry North II. This permit shall be finaled.
SWPPP binder and ESC permit sign posted on site. SWPPP inspection reports have been completed, currently inspecting every 14 days. No trackout or sediment runoff.
Hillsides has been horizontally tracked and mulch application has been applied. Too hot for revegetation currently,, will check on schedule. No hillside wattles have been installed as indicated on the ESC site plan.
No immediate corrections, need to review hillside erosion controls to be implemented (slope interupting wattles, revegetation)
|
DOC - Permit Finaled | 6/30/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/13/2017 | 6/13/2017 | 6/19/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
Conference | 6/2/2017 | 6/5/2017 | 6/7/2017 | A | PEND |
Andy J. Long
|
|
|
call RP about dust control/stabilization of dirt at site entrance
|
General Inspection | 6/2/2017 | 6/2/2017 | 6/2/2017 | P | PART |
Andy J. Long
|
|
|
WIP. No trackout or sediment runoff down Bogus Basin Road. Site has 1 water truck in service. No dust on upper hillside but areas around entrance have layer of loose dirt that blows in the wind. Need roadmix or temorary mulch to settle loose dirt. Will inform RP on Monday.
|
General Inspection | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on excavation. SWPPP available. No SWPPP inspections have been logged. Construction entrance is in good condition. Silt fence is in good condition. No trackout onto bogus basin rd. Correction requested: log inspections in SWPPP binder. Talked with RP and clarified inspection frequencies with him.
|
Site Preparation | 3/28/2017 | 4/4/2017 | 4/3/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted. Construction entrance is installed. Silt fence along bottom portion of site.
|
Site Preparation | 3/27/2017 | 3/28/2017 | 3/28/2017 | A | PEND |
Melissa Jannusch
|
|
|
Silt fence installed. DI protection installed. install Need to post sign and construction entrance. Talked with RP and Zack onsite about requests.
|
Site Preparation | 3/16/2017 | 3/22/2017 | 3/22/2017 | P | NR |
Melissa Jannusch
|
|
|
Pre-construction meeting. Reviewed plan for construction. Discussed requirement that BMPs are installed before site inspection is requested. Plan to meet onsite for the site preparation and walk through SWPPP and ESC plan. A drainage basin is to be constructed at the lowest point on the site and will be used as a sediment control method. Not cleared to start until after site preparation inspection is complete.
|
General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Melissa Jannusch
|
|
|
No WIP.
|
Issue & PRINT permit COM | | | 12/19/2016 | | DONE |
|
|
|
Ok to issue per Andy L
|
Routing - Erosion and Sediment | 10/27/2016 | | 10/27/2016 | | PASS |
Andy J. Long
|
|
|
SWPPP with narrative and site map approved. Valid PD and RP designated. ESC site preparation/pre-construction conference required.
|
Application received | | | 10/20/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 20 2016 7:52AM
|