Site Final | 11/9/2017 | 11/13/2017 | 11/14/2017 | A | PASS |
Andy J. Long
|
|
|
Work complete, disturbed area stabilized. All permits finaled.
|
General Inspection | 10/31/2017 | 10/31/2017 | 10/31/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/16/2017 | 10/16/2017 | 10/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/29/2017 | 9/29/2017 | 10/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/14/2017 | 9/14/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/25/2017 | 8/25/2017 | 8/25/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/10/2017 | 8/10/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/26/2017 | 7/26/2017 | 7/26/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/7/2017 | 7/7/2017 | 7/7/2017 | | CANC |
Andy J. Long
|
|
|
|
Routing - Erosion and Sediment | 6/21/2017 | | 6/21/2017 | | DONE |
Andy J. Long
|
|
|
See BLD17-02022 for pool permit. RP for pool is Sean Lamm
|
General Inspection | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PASS |
Daryl Spivey
|
|
|
|
Site Preparation | 10/20/2016 | 10/27/2016 | 10/27/2016 | P | PASS |
Andy J. Long
|
|
|
Permit sign posted. Initial BMPs installed. Existing hillsdie home with demo and addition/remodel. Silt fence at low corner is trenched in. Vegetation and retaining walls to be preserved. Work to begin next week. Approved.
|
Permit Ready to Issue | | | 10/21/2016 | | DONE |
|
|
|
|
Telephone call | | | 10/21/2016 | | DONE |
|
|
|
called Bryan to let know permit is ready
|
Issue & PRINT permit SFD | | | 10/21/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/20/2016 | | DONE |
|
|
|
|
Application received | | | 10/20/2016 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/20/2016 | | 10/20/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan submitted and approved. Valid RP and PD designated. ESC site prep required, call ###-####.
|