Site Final | 5/24/2017 | 5/24/2017 | 5/25/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 5/25/2017 | 5/25/2017 | 5/25/2017 | A | PASS |
Jim Sly
|
|
|
|
General Inspection | 3/8/2017 | 3/9/2017 | 3/9/2017 | A | PEND |
Andy J. Long
|
|
|
follow up to corrections
No new trackout. Landscping in progress. Inlet has sediment protection.
Note - Chaucer sub needs designated washout pit to prevent dumping and trackout ESC15-00951
|
Site Preparation | 2/27/2017 | 3/6/2017 | 3/8/2017 | A | CANC |
Andy J. Long
|
|
|
Follow up concrete washout/slurry
|
BMP Violation | 2/23/2017 | 2/27/2017 | 2/27/2017 | P | CANC |
Melissa Jannusch
|
|
|
Rescheduled. Spoke with RP slurry will be cleaned up later this week along with installation of concrete washout. Trackout has been addressed.
|
BMP Violation | 2/27/2017 | 2/27/2017 | 2/27/2017 | P | CANC |
Melissa Jannusch
|
|
|
|
BMP Violation | 2/23/2017 | 2/23/2017 | 2/23/2017 | P | FAIL |
Melissa Jannusch
|
|
|
No concrete washout. Concrete slurry on dirt. Trackout Correction requested Clean up slurry install BMP for concrete washout. Clean trackout Talked with RP Kelley. Plans to clean trackout and slurry. Will call once concrete washout is set up
|
Issue & PRINT permit SFD | | | 11/18/2016 | | DONE |
|
|
|
|
Application received | | | 10/27/2016 | | |
|
|
|
|