Site Final | 8/2/2017 | 8/2/2017 | 8/2/2017 | A | PASS |
Andy J. Long
|
|
|
Parking lot project complete. All loose materials swept. No temporary BMPs left on or around site. ESC permit conditions satisfied.
|
General Inspection | 7/31/2017 | 7/31/2017 | 8/1/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 5/30/2017 | 5/30/2017 | 5/30/2017 | P | PASS |
Andy J. Long
|
|
|
Adrian)Phone #: ###-####
Work to begin on parking lot refinishing and curb work. Flat site with onsite stormwater retention, RP to provide sediment protection. Concrete work to begin later in week. Crew will provide designated washout.
Approved for construction.
|
Permit Ready to Issue | | | 11/15/2016 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 11/15/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/15/2016 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 11/8/2016 | | 11/8/2016 | | DONE |
Andy J. Long
|
|
|
ESC site plan and narrative approved. Valid PD and RP to be designated.
|
Application received | | | 11/2/2016 | | |
|
|
|
|